Hydrofracturing / Hydrofracking

Hydrofracturing may be the solution to a well that runs out of water or one that does not produce enough water.

What is it?
Hydrofracturing (or hydrofracking) is a process that we used to increase the flow of water into a well. It is usually applied to low yielding wells or just to increase flow for irrigation. There are many instances of hydrofracturing resulting in increased yield for homeowners. The process can take place at the time a new well is constructed or it can be used at any time on an existing well with low or declining yield. It is only suitable for wells receiving their water from water moving through fractures and fissures in bedrock Hydrofracturing may widen fractures in the bedrock and extend them further into the formation and so increase the network of water bearing fractures/ fissures supplying water to the well. In most states, hydrofracturing work can only be undertaken by a licensed or registered water well contractor

How does it work?
The procedure involves lowering down the well one or two inflatable packers. First, all pipes, wires and the pump need to be removed from the well. The packers are then inflated to seal off a section of the well. The packers are usually set a minimum of 20 feet below the end of the casing and 60 feet below ground surface. Water is pumped at high pressure into the section of the well between the packers for zone hydrofracking, or below the packer if only one is used.Most hydrofracturing equipment for private wells can provide between 500 and 2000 psi pressure, sometimes up to 3,000 psi (pounds per square inch). Up to 150 gallons a minute, much less gallons per minute is usually adequate as a pumping rate for adding water into the well.

The water pressure within the sealed-off section of the well will rise as the surrounding rocks resist the flow of water out of the well. A sign of successful hydrofracturing is a sudden drop in the pressure indicating that the surrounding rocks are accepting water. If more fissures have been opened there is often a strong backflow of turbid water when pumping into the well is stopped.

The cost for single packer hydrofracturing is usually less than when a double packer system is used. A double system allows for a selected zone in the well to pressured by inflating both packers. The packers are usually first set near the bottom of the well and then moved up to another section. Selection of the zones to pressurize may be made from information on the well drillers log or from a down-hole camera survey. Although not often used, some contractors may use proppants (small beads or sand grains) to keep open (prop) fractures & cracks in the rock.

Points for a well owner to note about the hydrofracturing process

  • In order to assess the effectiveness of the hydrofracturing process the contractor will usually perform a “before & after” test of the well yield.
  • There is the potential for the hydrofracturing process to temporarily influence water levels or turbidity in a close-by neighboring well if the two wells share some of the same fractures.
  • There have been instances where vertical fractures to the surface have caused a breakout of water above ground.
  • After hydrofracturing, we will normally purge the well of fine material but there could be some cloudiness in the water for a few days.
  • It is normal practice to sanitize a well after any maintenance or well development work. You may have to wait 24 hours before the well can be put back into use.

The beneficial effects of hydrofracturing should be permanent but are not always, and usually achieve a satisfactory water yield for less cost than drilling a new well. With more and more well being drilled there is an increase need of hydrofracturing, the process is becoming routine for areas where there are typically low yielding wells in bedrock.